色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Flood control sub-dike with freely extendable temporary heightening during flood season - China Supplier
China Flood control sub-dike with freely extendable temporary heightening during flood season - China Supplier China Flood control sub-dike with freely extendable temporary heightening during flood season - China Supplier China Flood control sub-dike with freely extendable temporary heightening during flood season - China Supplier China Flood control sub-dike with freely extendable temporary heightening during flood season - China Supplier China Flood control sub-dike with freely extendable temporary heightening during flood season - China Supplier

Flood control sub-dike with freely extendable temporary heightening during flood season

Price:Negotiable
Industry Category: Energy/Petroleum Fuels/ Other Petroleum Fuels
Product Category:
Brand: 冀虹
Spec: WX-2013


Contact Info
  • Add:長安區(qū)東勝廣場B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

I. Purpose of Hebei Five-Star Power Equipment Co., Ltd.'s Flood Control Sub-Dike

[Five-Star] Prefabricated Panel Dam Flood Control Sub-Dike is mainly used for emergency flood control and rescue on soft and hard levees such as sandy loam, loam, clay, concrete, and asphalt to prevent overtopping.

II. Main Features of the Flood Control Sub-Dike

The [Five-Star] Prefabricated Panel Dam Flood Control Sub-Dike from Hebei Five-Star Power Equipment Co., Ltd. is a new, fast, low-cost, and environmentally friendly disaster prevention and mitigation equipment that breaks through traditional thinking modes and abandons traditional dike-building materials and processes. It features water control using water, high efficiency and speed; flexible dam assembly and strong adaptability; easy storage and transportation, low cost; recyclable and reusable, green and environmentally friendly, among other characteristics.

III. Main Specifications of the Prefabricated Panel Dam Flood Control Sub-Dike

1. Sub-dike dimensions: 1.2 m * 10m ;

2. Sub-dike unit width: 1m;

3. Applicable levee materials: sandy loam, loam, clay/concrete, asphalt;

4. Sub-dike height: 1.30/1.35m;

5. Water retention height: 1.0m ;

6. Original levee top width: 4.0m or more;

7. Safety factor k: 2.0-3.35;

8. Design wind speed: 6.0m/s ;

9. Design river width/wave height: 4km/0.3m;

10. Gross weight: 260kg ;

11. Net weight: 225kg ;

12. Construction speed: 60 minutes for 100 people/km

IV. Structural Principle of the Prefabricated Panel Dam Flood Control Sub-Dike

1. Structure and Function of the [Five-Star] Prefabricated Panel Dam Flood Control Sub-Dike

The [Five-Star] Prefabricated Panel Dam Flood Control Sub-Dike mainly consists of two parts:

(1) Sub-dike support angle frame: Made of aluminum alloy profiles connected by shafts, it is directly installed behind the water-retaining panel using a rotating shaft. It can be folded together with the panel when not in use and quickly deployed as the support framework of the dam body when needed. Crossbeam connecting rod: Made of aluminum alloy square materials connected with special joints, it serves as the connecting support rod of the dam body.

(2) Foldable water-retaining panel: The [Five-Star] exclusively developed foldable water-retaining panel uses connecting shafts to link multiple panels into a whole. When not in use, several panels can be folded together to reduce space. When in use, they can be instantly deployed to speed up assembly. The foldable water-retaining panel is made of corrugated fiberglass material or specially made color steel plate, aluminum alloy plate, and waterproof PVC plate, connected to the crossbeam as one unit through special fixing devices. Its functions: first, as a connecting piece to link adjacent angle frames to form the load-bearing carrier of the dam body; second, as a rigid connecting plate. The bottom of the panel is equipped with positioning fixing piles, made of pressed round steel. Depending on the levee foundation, there are two usage methods: when used on soft levee foundations, it is placed upside down in the trench to resist displacement; when used on hard levee foundations, it serves to position, retain water, prevent seepage, and compact the water-sealing elastomer.

V. Working Principle of Hebei Five-Star Power Equipment Co., Ltd.'s Prefabricated Panel Dam Flood Control Sub-Dike

The [Five-Star] Prefabricated Panel Dam Flood Control Sub-Dike applies the principle of panel dams in hydraulic engineering. It uses multiple angle frames, crossbeams, foldable water-retaining support panels, and other components connected and tightened to form a rigid sub-dike body. The water-retaining support panel functions as the water-retaining panel of a panel dam.


Industry Category Energy/Petroleum Fuels/ Other Petroleum Fuels
Product Category
Brand: 冀虹
Spec: WX-2013
Stock: 9999
Manufacturer:
Origin: China / Hebei / Shijiazhuangshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 汝南县| 光山县| 临朐县| 和龙市| 攀枝花市| 朝阳县| 镇宁| 乌鲁木齐市| 天峻县| 克拉玛依市| 精河县| 余姚市| 黑水县| 灵丘县| 东明县| 博野县| 辽阳县| 西畴县| 澄城县| 台北县| 双鸭山市| 高平市| 航空| 西藏| 山东| 格尔木市| 车险| 南郑县| 边坝县| 泌阳县| 鸡泽县| 达日县| 丁青县| 饶河县| 巨鹿县| 竹溪县| 吉木萨尔县| 临清市| 仁化县| 筠连县| 阳春市|