China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier

Structure and Working Principle of Prefabricated Flood Control Sub-dike

Price:1 /套
Industry Category: Printing/Plastic Films/Other Plastic Films
Product Category:
Brand: 冀虹
Spec: WX-2013


Contact Info
  • Add:長(zhǎng)安區(qū)東勝?gòu)V場(chǎng)B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

I. Purpose of Hebei Five-Star Power Equipment Co., Ltd.'s Flood Control Sub-Dike
[Five-Star] The assembled panel dam flood control sub-dike is primarily used for emergency flood control and embankment reinforcement on soft and hard embankments such as sandy loam, loam, clay, concrete, and asphalt.
II. Main Features of the Flood Control Sub-Dike
Hebei Five-Star Power Equipment Co., Ltd.'s [Five-Star] assembled panel dam flood control sub-dike is a new, fast, economical, and environmentally friendly disaster prevention and mitigation device that breaks through traditional thinking modes and abandons conventional dike-building materials and techniques. It features water control using water, high efficiency and speed; flexible dam assembly and strong adaptability; easy storage and transportation with low cost; recyclable and reusable, green and environmentally friendly, among other characteristics.
III. Main Specifications of the Assembled Panel Dam Flood Control Sub-Dike
1. Sub-dike dimensions: 1.2 m * 10 m;
2. Sub-dike unit width: 1 m;
3. Applicable embankment types: sandy loam, loam, clay/concrete, asphalt;
4. Sub-dike height: 1.30/1.35 m;
5. Water retention height: 1.0 m;
6. Original embankment top width: 4.0 m or more;
7. Safety factor k: 2.0-3.35;
8. Design wind speed: 6.0 m/s;
9. Design river width/wave height: 4 km/0.3 m;
10. Gross weight: 260 kg;
11. Net weight: 225 kg;
12. Construction speed: 60 minutes for 100 people/km
IV. Structural Principle of the Assembled Panel Dam Flood Control Sub-Dike
1. Structure and Function of [Five-Star] Assembled Panel Dam Flood Control Sub-Dike
[Five-Star] assembled panel dam flood control sub-dike mainly consists of two parts:
(1) Sub-dike support angle frame: Made of aluminum alloy profiles connected by axles, it is directly installed behind the water-retaining panel using a rotating shaft. It can be folded together with the panel when not in use and quickly deployed as the support framework of the dam body when needed. Beam connecting rod: Made of aluminum alloy square materials connected with special joints, it serves as the connecting support rod of the dam body.
(2) Foldable water-retaining panel: [Five-Star] exclusively developed foldable water-retaining panels are connected into a whole using connecting axles between panels. When not in use, multiple panels can be folded together to reduce space. When in use, they can be instantly unfolded to increase assembly speed. The foldable water-retaining panels are made of corrugated fiberglass materials or specially made color steel plates, aluminum alloy plates, and waterproof PVC plates, which are connected to the beams as a whole through special fixing devices. Their functions: first, as connectors to link adjacent angle frames to form the load-bearing carrier of the dam body; second, as rigid connecting plates. The bottom of the panels is equipped with positioning fixing piles, formed by pressed round steel. Depending on the embankment foundation, there are two usage methods: when applied on soft embankment foundations, they are inverted in the trench to resist displacement; when applied on hard embankment foundations, they serve as positioning water-retaining anti-seepage plates and compacted water-stop elastomers.
V. Working Principle of Hebei Five-Star Power Equipment Co., Ltd.'s Assembled Panel Dam Flood Control Sub-Dike
[Five-Star] assembled panel dam flood control sub-dike adopts the principle of panel dams in hydraulic engineering. It forms a rigid sub-dike body by connecting and fastening multiple angle frames, beams, foldable water-retaining support panels, and other components. The water-retaining support panels function as the water-retaining panels in panel dams. 

Industry Category Printing/Plastic Films/Other Plastic Films
Product Category
Brand: 冀虹
Spec: WX-2013
Stock: 9999
Manufacturer:
Origin: China / Hebei / Shijiazhuangshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 蓝山县| 连城县| 塘沽区| 浦县| 尚义县| 安西县| 雷波县| 大庆市| 克什克腾旗| 津市市| 翁源县| 钦州市| 扎兰屯市| 北海市| 乡城县| 宝丰县| 遂宁市| 呼图壁县| 凤凰县| 临朐县| 河间市| 庆阳市| 柳州市| 师宗县| 雷山县| 庆阳市| 太和县| 广南县| 进贤县| 廊坊市| 黑山县| 上蔡县| 叶城县| 永定县| 德清县| 类乌齐县| 青浦区| 丰城市| 基隆市| 临江市| 河北区|