色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Precautions for Using Steam Generators - China Supplier
China Precautions for Using Steam Generators - China Supplier

Precautions for Using Steam Generators

Price:¥10000 /t
Industry Category:
Product Category:
Brand: 納德
Spec: ND-1050


Contact Info
  • Add:湖北省天門市經濟開發(fā)區(qū)緯五路以南、接官路以東300米, Zip: 431700
  • Contact: 范天煜
  • Tel:15271210888
  • Email:2381609225@qq.com

Other Products

Description
Additional Information

Precautions during use, I have briefly summarized these points. Any omissions are welcome to be supplemented.

(1) The steam generator strictly prohibits the use of well water, river water, or lake water, as untreated water contains high mineral content. Although some water may appear clear to the eye without turbidity, after repeated boiling in the boiler's inner tank, the minerals in untreated water will undergo more severe chemical reactions. They will adhere to the heating tube and liquid level controller, leading to the following issues:

(a) Excessive scale on the heating tube surface will prolong heating time and increase power consumption.

(b) Excessive scale on the heating tube surface will significantly reduce the heating tube's lifespan.

(c) Excessive scale on the liquid level controller will cause malfunction, failure to operate, and may result in the heating tube burning out.

(2) This machine should be operated by designated personnel who have thoroughly read the instruction manual. It is essential to follow the warning labels on the machine and the operating instructions.

(3) When using a three-phase power supply, connect the wire labeled "N" to the neutral line of the power supply, and connect the three wires labeled "live wire" to the A, B, and C phase live lines of the power supply, respectively.

(4) The machine's exterior must be grounded.

(5) Before each startup, check whether the power supply is normal and ensure the water tank is filled.

(6) After each shutdown, promptly drain the water and steam from the steam generator boiler's inner tank and turn off the main power supply. Otherwise, the gas inside the machine will cool and turn into false gas. The next day, when starting up, the pressure will rise quickly, but only water will come out when the valve is opened.

(7) During operation, pay attention to timely blowdown. It is best to perform blowdown twice a day. Blowdown should be carried out at a pressure of 0.15 MPa to prevent pipeline blockage. Ensure the blowdown pipeline is properly connected to avoid scalding.

(8) Proper use of the machine will significantly extend its lifespan and save electricity costs.

Industry Category
Product Category
Brand: 納德
Spec: ND-1050
Stock: 1000
Manufacturer:
Origin: China / Hubei / Tianmenshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經營性-2023-0192
ChatGlobal Chat Now 深泽县| 河西区| 襄城县| 高安市| 忻城县| 芦溪县| 鲜城| 东莞市| 新密市| 滦南县| 英德市| 永昌县| 浮山县| 三明市| 南部县| 荔浦县| 鲁甸县| 江城| 临西县| 临西县| 黎平县| 梁山县| 嘉善县| 霞浦县| 鹿邑县| 茂名市| 农安县| 娱乐| 新田县| 沙湾县| 汝城县| 女性| 玉环县| 拉孜县| 阳城县| 广平县| 昌平区| 车致| 惠来县| 盐山县| 兰州市|