What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably along walls, columns, or beams.

2. Based on the routing direction of cable trays and wireways, the civil and structural disciplines should propose the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical disciplines is essential.

3. The wiring of underground concealed metal wireways should be closely coordinated with the civil design discipline, with routes and equipment selection reasonably determined according to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are laid on the same cable tray, a partition should be added in between for isolation.

5. When additional concentrated loads are not considered during installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray should be calculated based on the even distribution of cable weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray should meet the following requirements, or corresponding protective measures should be taken.

(1) Cable trays should be above corrosive liquid pipelines.

(2) Cable trays should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, cable trays should be above the pipelines.

(4) When flammable and explosive gases are lighter than air, cable trays should be below the pipelines.

(5) For the minimum distance between cable trays and pipelines, refer to relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should comply with relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Electrical & Electronics
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 育儿| 驻马店市| 东乡县| 天柱县| 磐石市| 正安县| 延吉市| 南宫市| 淮滨县| 城固县| 宝应县| 哈尔滨市| 隆昌县| 镇远县| 丁青县| 衡山县| 文成县| 定结县| 泉州市| 麻江县| 罗山县| 彩票| 张家川| 兖州市| 城市| 景德镇市| 昌都县| 靖江市| 饶阳县| 高清| 汾西县| 贞丰县| 河南省| 陈巴尔虎旗| 阳山县| 凌海市| 溧阳市| 侯马市| 黄陵县| 萍乡市| 湄潭县|