色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement - China Supplier
China Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement - China Supplier China Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement - China Supplier

Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement

Price:¥4 /m
Industry Category: Construction & Building Materials
Product Category:
Brand: 中大恒建
Spec: 25


Contact Info

Other Products

Description
Additional Information

Grouting is performed using a dedicated integrated grout preparation and injection machine. The grouting material features micro-expansion, high fluidity, early strength, no bleeding, and extended operability. It not only fills voids but also compensates for or repairs defects in the secondary lining concrete, thereby enhancing the overall quality of the lining concrete.

II. Characteristics of the Tunnel Arch Crown Grouting Process with Formwork:

1. The top of the secondary lining formwork is pre-embedded with grouting pipes and grout vent holes, which also serve as inspection holes to check the fullness of the arch crown concrete.

2. The grouting equipment includes WX-RPC grouting pipes (hereinafter referred to as RPC pipes), micro-expansion slow-setting early-strength filling mortar, and an integrated grout preparation and injection machine. The equipment is simple, easy to move, and operate.

3. The operation is straightforward; grouting for one section of the secondary lining takes only about 2 hours and does not interfere with the normal secondary lining construction schedule.

4. Grouting with formwork can begin when the concrete initially sets. The grouting pressure is significantly higher than that applied after formwork removal, improving the integrity between the lining concrete and the grout, and repairing various concrete defects.

5. During grouting with formwork, the secondary lining concrete is protected by the trolley formwork and remains undamaged. Typically, the concrete pouring pressure exceeds 6 MPa, while the grouting pressure generally does not exceed 1.0 MPa.

III. Key Points of the Tunnel Arch Crown Grouting Process with Formwork:

1. The construction process involves pre-embedding radial grouting pipes in the trolley. Grouting is performed through these pipes promptly 2 hours after the secondary lining construction is completed. The operation can be carried out using a dedicated integrated grout preparation and injection machine. The grouting material exhibits micro-expansion, high fluidity, early strength, no bleeding, and slow-setting properties. It not only serves to fill voids but also compensates for or repairs defects in the secondary lining concrete.

Industry Category Construction & Building Materials
Product Category
Brand: 中大恒建
Spec: 25
Stock: 32321
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 黔江区| 松桃| 余姚市| 庄浪县| 尼勒克县| 大名县| 德阳市| 建宁县| 大同县| 富平县| 平阴县| 札达县| 句容市| 松滋市| 六盘水市| 鸡东县| 黄冈市| 昂仁县| 通辽市| 清远市| 西吉县| 白银市| 五寨县| 遂平县| 衡东县| 通许县| 舒城县| 宣化县| 余庆县| 恩施市| 汉寿县| 罗源县| 西乌| 邓州市| 清苑县| 岗巴县| 墨江| 句容市| 上高县| 玉山县| 沁阳市|