色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Home Sauna Room Design and Construction - China Supplier
China Home Sauna Room Design and Construction - China Supplier China Home Sauna Room Design and Construction - China Supplier China Home Sauna Room Design and Construction - China Supplier

Home Sauna Room Design and Construction

Price:¥199 /㎡
Industry Category: Sports & Entertainment
Product Category:
Brand: 大連中野汗蒸設(shè)備
Spec: 大連汗蒸房


Contact Info
  • Add:沈陽市鐵西區(qū)北一東路, Zip: 110000
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Dalian Sauna Room, Jinzhou Beauty Salon Sauna, Wafangdian Fire Dragon Bath, Pulandian Electric Heated Kang, Lüshun Tourmaline Sauna, Zhuanghe Tourmaline Sauna, Changhai County Bath and Sauna Construction

Detailed Construction Process of Dalian Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Using Far-Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for temperature controller.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, protective base layer installation.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Evaluation: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Open the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 大連中野汗蒸設(shè)備
Spec: 大連汗蒸房
Stock:
Origin: China / Liaoning / Dalianshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Me 宝兴县| 通道| 夹江县| 佳木斯市| 乌鲁木齐市| 兴隆县| 陈巴尔虎旗| 顺平县| 武川县| 曲松县| 夏邑县| 稷山县| 永胜县| 金湖县| 苗栗县| 新密市| 城固县| 灵丘县| 鹤峰县| 仁布县| 门头沟区| 临清市| 长宁县| 临江市| 浮梁县| 田阳县| 石渠县| 泸西县| 黔西县| 石泉县| 类乌齐县| 岚皋县| 稻城县| 璧山县| 高安市| 屯留县| 邵阳县| 宁蒗| 宁国市| 九龙城区| 资溪县|