色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Installation of a Sauna Room - China Supplier
China Installation of a Sauna Room - China Supplier China Installation of a Sauna Room - China Supplier

Installation of a Sauna Room

Price:¥199
Industry Category: Sports & Recreation/Sauna & Foot Bath Equipment/Sauna & Foot Spa Equipment
Product Category:
Brand: 延邊中野汗蒸設備
Spec: 延邊中野汗蒸設備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Yanbian Hanjimjilbang, Tumen Beauty Sauna, Dunhua Fire Dragon Bath, Hunchun Tourmaline, Longjing, Helong Bath and Sauna, Wangqing, Antu

Detailed Construction Process of Yanji Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Main Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic power-off at 70°C).
III. Construction Process (Taking Far-Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction boxes for temperature controllers.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion joints), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please wait patiently.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Evaluation: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Recreation/Sauna & Foot Bath Equipment/Sauna & Foot Spa Equipment
Product Category
Brand: 延邊中野汗蒸設備
Spec: 延邊中野汗蒸設備
Stock: 999
Manufacturer:
Origin: China / Jilin / Yanbianchaoxianzuzizhizhou
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經營性-2023-0192
ChatGlobal Chat Now 芦溪县| 睢宁县| 库尔勒市| 平江县| 岳普湖县| 郑州市| 遵义市| 澎湖县| 安达市| 将乐县| 东乡县| 句容市| 威宁| 临朐县| 微山县| 贡山| 南安市| 阿瓦提县| 惠东县| 泰和县| 文山县| 通渭县| 长顺县| 赞皇县| 临潭县| 华容县| 嘉善县| 宁陕县| 台山市| 江都市| 墨江| 浠水县| 朝阳市| 凤冈县| 鹤山市| 南充市| 自贡市| 卓尼县| 修水县| 新绛县| 谢通门县|