色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Sauna Room Installation and Construction Design - China Supplier
China Sauna Room Installation and Construction Design - China Supplier China Sauna Room Installation and Construction Design - China Supplier China Sauna Room Installation and Construction Design - China Supplier

Sauna Room Installation and Construction Design

Price:¥199 /㎡
Industry Category:
Product Category:
Brand: 赤峰中野汗蒸設(shè)備
Spec: 赤峰中野汗蒸設(shè)備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Chifeng Sauna Room, Ningcheng Fire Dragon Bath, Linxi Beauty Sauna Spa, Baling Tourmaline, Harqin Banner Beauty Sauna, Aohan Banner Nano Sauna, Ar Horqin Banner Bath and Sauna, Ongniud Banner, Hexigten Banner

Detailed Construction Process of Chifeng Sauna Rooms
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifanite, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Zero Formaldehyde Emission


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer setup.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction boxes for thermostats.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion joints), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensors (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rise from 20°C to 55°C, slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance ≥50MΩ measured with a megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category
Product Category
Brand: 赤峰中野汗蒸設(shè)備
Spec: 赤峰中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Inner Mongolia / Chifengshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 普陀区| 五大连池市| 景东| 行唐县| 淳化县| 濮阳县| 邹平县| 来安县| 库车县| 九台市| 岳阳市| 沂源县| 泉州市| 六安市| 康保县| 西安市| 克什克腾旗| 旌德县| 平乡县| 莱西市| 台前县| 平潭县| 城口县| 仙桃市| 邹城市| 绵阳市| 泽库县| 页游| 昌黎县| 保山市| 阳原县| 成都市| 岗巴县| 牟定县| 永川市| 祁门县| 长岭县| 太原市| 杂多县| 荥经县| 平泉县|