色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Construction of Sauna Room Design and Installation - China Supplier
China Construction of Sauna Room Design and Installation - China Supplier China Construction of Sauna Room Design and Installation - China Supplier China Construction of Sauna Room Design and Installation - China Supplier

Construction of Sauna Room Design and Installation

Price:¥199 /㎡
Industry Category:
Product Category:
Brand: 通遼中野汗蒸設備
Spec: 通遼中野汗蒸設備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Tongliao Hanjimjilbang, Kailu Sauna, Kulun Fire Dragon Bath, Naiman Banner Tourmaline, Jarud Banner Beauty Sauna, Horqin Bath and Sauna, Huolin Gol City Ganbanyoku

Detailed Construction Process of Tongliao Hanjimjilbang
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna (heated by far-infrared light wave tubes/cables, temperature 40-60°C)
Salt Therapy Sauna (Himalayan salt bricks + negative ion system)
Jade Sauna (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer XPS Board Thickness ≥2cm, Fireproof Grade B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-Infrared Sauna as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer setup.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction boxes for thermostats.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, protective base layer.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gaps), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature probes (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category
Product Category
Brand: 通遼中野汗蒸設備
Spec: 通遼中野汗蒸設備
Stock: 999
Manufacturer:
Origin: China / Inner Mongolia / Tongliaoshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 阿图什市| 卢氏县| 罗源县| 蒙城县| 沙洋县| 景谷| 商河县| 怀宁县| 陈巴尔虎旗| 静安区| 岚皋县| 新津县| 永和县| 肥城市| 襄樊市| 海兴县| 云阳县| 稷山县| 山阳县| 丰城市| 建平县| 中牟县| 吉隆县| 渑池县| 渑池县| 永城市| 明溪县| 余姚市| 库伦旗| 黑山县| 凉城县| 疏附县| 柳江县| 安达市| 张家川| 菏泽市| 龙陵县| 中西区| 滨州市| 博兴县| 沂南县|