色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Installation of steam room design and sauna room construction - China Supplier
China Installation of steam room design and sauna room construction - China Supplier China Installation of steam room design and sauna room construction - China Supplier China Installation of steam room design and sauna room construction - China Supplier

Installation of steam room design and sauna room construction

Price:¥199 /㎡
Industry Category:
Product Category:
Brand: 朝陽中野汗蒸設備
Spec: 朝陽中野汗蒸設備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Chaoyang Sauna Room, Beipiao Beauty Sauna Spa, Lingyuan Fire Dragon Bath, Kazuo Electric Heated Kang, Jianping Bath and Sauna Construction

Detailed Construction Process of Chaoyang Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far Infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far Infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Pine (Residential), Salt Bricks Moisture Content ≤12%, Zero Formaldehyde Emission


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Using Far Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rise from 20°C to 55°C, slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category
Product Category
Brand: 朝陽中野汗蒸設備
Spec: 朝陽中野汗蒸設備
Stock: 999
Manufacturer:
Origin: China / Liaoning / Chaoyangshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經營性-2023-0192
ChatGlobal Chat Now 铜梁县| 杂多县| 大渡口区| 松溪县| 湖口县| 疏勒县| 盐源县| 宁乡县| 荆门市| 石楼县| 清水河县| 临西县| 塘沽区| 应城市| 阿拉尔市| 宜昌市| 抚州市| 炉霍县| 龙游县| 九台市| 华宁县| 平定县| 公安县| 邹平县| 镇安县| 花莲市| 宝坻区| 邓州市| 剑河县| 黄梅县| 突泉县| 岳阳县| 衢州市| 朝阳县| 碌曲县| 屯门区| 襄垣县| 东光县| 包头市| 清河县| 永康市|