色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Construction and Installation of Sauna and Steam Rooms - China Supplier
China Construction and Installation of Sauna and Steam Rooms - China Supplier China Construction and Installation of Sauna and Steam Rooms - China Supplier China Construction and Installation of Sauna and Steam Rooms - China Supplier

Construction and Installation of Sauna and Steam Rooms

Price:¥199 /㎡
Industry Category: Sports & Entertainment
Product Category:
Brand: 錦州中野汗蒸設(shè)備
Spec: 錦州中野汗蒸設(shè)備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Jinzhou Sauna Room, Beizhen Beauty Salon Sauna, Heishan Fire Dragon Bath, Yi County Tourmaline, Linghai Electric Heated Kang

Detailed Construction Process of Jinzhou Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Home use (3-8㎡), commercial use (15-50㎡), or comprehensive wellness centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared sauna rooms (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt therapy sauna rooms (Himalayan salt bricks + negative ion system)
Jade sauna rooms (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Pine (Home Use), Salt Bricks Moisture Content ≤12%, No Formaldehyde Emission


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, protective base layer installation.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Key Points
Daily Management
Open the door after daily use to release moisture.
Wipe the decorative surface monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 錦州中野汗蒸設(shè)備
Spec: 錦州中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Liaoning / Jinzhoushi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 田林县| 庄河市| 漳平市| 利津县| 阜新市| 南岸区| 黄浦区| 淮滨县| 定远县| 芜湖县| 新干县| 双流县| 邢台市| 卓资县| 墨江| 朝阳区| 盘山县| 芜湖县| 南安市| 钦州市| 陵川县| 青田县| 汤原县| 霍城县| 固始县| 平远县| 昭通市| 富锦市| 南溪县| 陵川县| 彩票| 宜兰市| 仁布县| 镇平县| 克山县| 志丹县| 道真| 平远县| 池州市| 大渡口区| 长顺县|