色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Construction of Sauna and Steam Rooms - China Supplier
China Construction of Sauna and Steam Rooms - China Supplier China Construction of Sauna and Steam Rooms - China Supplier China Construction of Sauna and Steam Rooms - China Supplier

Construction of Sauna and Steam Rooms

Price:¥199
Industry Category:
Product Category:
Brand: 松原中野汗蒸設備
Spec: 松原中野汗蒸設備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Songyuan Sauna Room, Changling Beauty Sauna Spa, Qian'an Fire Dragon Bath, Fuyu Tourmaline, Qianguoer Bathing and Sauna

Detailed Construction Process of Songyuan Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; it may be slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Open the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category
Product Category
Brand: 松原中野汗蒸設備
Spec: 松原中野汗蒸設備
Stock: 999
Manufacturer:
Origin: China / Jilin / Songyuanshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 盱眙县| 惠来县| 金乡县| 武清区| 将乐县| 石渠县| 汨罗市| 乌拉特后旗| 阿合奇县| 白城市| 晋州市| 文昌市| 新平| 中方县| 浮山县| 北流市| 恭城| 绵竹市| 龙川县| 景谷| 鄂伦春自治旗| 滁州市| 枝江市| 临武县| 灵宝市| 隆回县| 新宁县| 安福县| 京山县| 莱芜市| 十堰市| 淮南市| 南丰县| 丰镇市| 同仁县| 绵阳市| 深泽县| 平昌县| 伊金霍洛旗| 象州县| 凉山|