色播婷婷电影综合社区,AV女优不卡亚洲在线,99999AV,日韩人妻中文字幕视频,国产拍自偷,91人人妻,超碰在线81,免费福利视频一区,九草青草原在线看

China Sauna Room Construction and Installation - China Supplier
China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier

Sauna Room Construction and Installation

Price:¥199
Industry Category: Sports & Entertainment
Product Category:
Brand: 長春中野汗蒸設(shè)備
Spec: 長春中野汗蒸設(shè)備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Changchun Sauna Room, Dehui Beauty Sauna Spa, Jiutai Fire Dragon Bath, Yushu Tourmaline, Nongan Bathing and Sauna

Detailed Construction Process of Changchun Sauna Room
1. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
2. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Mongolian Scotch Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
3. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer setup.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden龍骨 fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
4. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rise from 20°C to 55°C, may be slightly slower immediately after construction, please wait patiently.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
5. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 長春中野汗蒸設(shè)備
Spec: 長春中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Jilin / Changchunshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 曲阜市| 曲沃县| 贡嘎县| 遂昌县| 闽侯县| 宜川县| 南雄市| 嘉黎县| 沙河市| 东光县| 靖安县| 宜昌市| 钦州市| 常宁市| 新蔡县| 从化市| 广南县| 英山县| 莲花县| 新巴尔虎右旗| 崇阳县| 青冈县| 基隆市| 淮阳县| 四平市| 米泉市| 商河县| 武威市| 鄂托克前旗| 曲周县| 屏南县| 丹棱县| 高邮市| 台前县| 英山县| 烟台市| 辽中县| 姚安县| 岳阳县| 依安县| 沽源县|